Material Preparing
  • English (UK)
  • Twenty one sets of ball grinder (1.5 tons) can ensure production, equipped with auto-feed equipment, alleviate the working strength. 
  • Timing inspector to control and record the grinding time.
  • Slurry dewatering with dehydrator, ensure the uniform water content
wetmilling
wetmilling

Production & Sales